August 18, 2025 1:37 am

Mount Roofing & Structures

Mr. Sher Singh – MD,
Mount Roofing & Structures Pvt. Ltd.

Provide a brief about the project- Project name, Functionality of the project, Occupancy, approximate cost, start date & date of completion?

  • Project Name: 1.2 Lakh Sq. Ft. Pre-Engineered Building at Sira, Tumkur, Karnataka
  • Functionality: Solar PV Manufacturing Facility
  • Occupancy: Industrial – PV Module Production

What is the uniqueness of this project? What is the challenge in designing the structural system & why has steel been chosen?
The uniqueness lies in completing the erection of a 1.2 lakh sq. ft. PEB structure in a single seamless stretch. This project required precision logistics, synchronized execution, and round-the-clock operations.

Steel was chosen for its high strength-to-weight ratio, flexibility in prefabrication, and rapid assembly – essential for a project with such compressed timelines. The challenge was ensuring structural stability during rapid installation and managing material flow with zero tolerance for delay.

Kindly explain the architectural & structural concept used in this project- Details of inception, evolu-tion of design, structural member framework/arrangement, choice of material etc. (Pls include details of section sizes/ layout etc.)
The project was designed as a high-clearance industrial shed with wide-span portal frames. The structural system used heavy-duty columns, rafters, and purlins – engineered for speed and durability.
Framework: Primary members – built-up I-sections; Secondary members – cold-formed Z-purlins and C-sections
Material : Over 450 tons of structural steel
Roofing & Cladding : Approx. 12,000 m² Sandwich PUF Roofing Panels, 4,000 m² PPGL wall sheeting
Sandwich PUF Panels: 1,20,000 sq. ft. of Sandwich PUF Panels were manufac-tured and delivered within 24 hours to support thermal efficiency

Any challenges faced during fabrication & installation? How was the issue resolved? What innovative techniques were used?
Yes, executing within such a tight timeframe posed logistical and operational challenges:

  • Fabrication: Required rapid roll-forming, precision cutting, and dispatch in batches
  • Installation: Needed 24/7 site operations, efficient crane manage-ment, and safety oversight

Resolutions & Innovations:

  • Multi-zone fabrication & dispatch sequencing
  • On-site monitoring teams coordinating hourly erection targets
  • Use of pre-labeled components and synchronized dispatch
  • Digital tracking tools to monitor erection stages in real time

What was the overall experience working on this project?
This project showcased what is possible when engineering precision meets execution excellence. It was a high-pressure, high-stakes challenge that transformed into a milestone achievement. Collaborating across design, fabrication, and on-site execution with such synergy made it a career-defining moment for the entire Mount team.

Along with the above, please share a candid photograph + Quote (25–50 words) along with some project pictures & drawings if any.
“I’m proud of how our team came together to deliver this project. It shows what’s possible when everyone works with focus and responsibility.”
Project Owner – Sira Project, Tumkur, Karnataka
Fabrication & Installation – Mount Roofing & Structures Pvt Ltd

Email : info@mountroof.com
Web : www.mountroof.com